Luckely Nasa stopped building telescopes and outsourced manufacturing to private companies. Now Nasa just do contracts
this post was submitted on 17 Sep 2023
10 points (81.2% liked)
Futurology
1813 readers
54 users here now
founded 1 year ago
MODERATORS
They can be made even cheaper if you reconfigure the mission goals to be taking blurry pictures of the moon.
I don't know how much of a factor the cost of the components themselves were in the ballooning costs of the JWST, but if COTS could represent a major savings in cost without compromising the performance of the spacecraft and risking catastrophic equipment failure in the harsh environment of deep space, I'm all for it.