this post was submitted on 01 Oct 2023
304 points (95.8% liked)

Technology

59641 readers
2671 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS
 

Microsoft Looking to Use Nuclear Reactors to Power Its Data Centers::undefined

you are viewing a single comment's thread
view the rest of the comments
[–] Earthwormjim91@lemmy.world 3 points 1 year ago (1 children)

That’s got nothing to do with Microsoft though. Their reactor wouldn’t be used to power other people, only their own data centers.

They currently buy that from the grid, and they don’t really have any control over the source of that electricity generation. We should absolutely be pushing the power generators to go with renewables, but Microsoft isn’t a generator. They’re a customer like you or me.

They’re looking at moving to small reactors eventually because of the cost of buying from the grid, not for the environment.

[–] Diplomjodler@feddit.de -1 points 1 year ago (1 children)

It would still be far cheaper to deploy the same kind of capacity in renewables. Whoever came up with this brilliant plan can't do basic math.

[–] Earthwormjim91@lemmy.world 2 points 1 year ago

Probably not because they would need to buy MUCH more land to do it.

SMRs are so much more compact per MW. The one from NuScale that is approved already can do 924MW in 0.05 square miles. To do the same capacity with wind would take 94 square miles and 17 square miles for solar.

Buying 17 square miles of land close enough to just one of their data centers would cost billions, on top of the cost of paying for the panels and installation.

The whole point of them looking at these at all is because they do not want to purchase from the grid.